New Developments · 8 of the best in Zemun

Nikola Tesla Airport expansion

New development·Surčin·Partly open

C-wing due 2027

Belgrade’s airport has almost doubled its terminal since 2019; a C-wing extension is due in 2027.

About Nikola Tesla Airport expansion

The airport beyond Zemun has been transformed: a terminal almost doubled in size since 2019, a new 3.5 km runway and a rebuilt main runway, with a C-wing extension due in 2027. A record 8.9 million passengers passed through in 2025, and direct flights now reach New York, Chicago and Toronto. Our advice: allow for building work around the terminal until the extension opens.

Our take

  • Terminal almost doubled since 2019
  • New 3.5 km runway
  • C-wing extension due 2027
Address
Surčin, Zemun
Price guide
Partly open (new developments price guide)

Get directions

Opening hours, prices and seasonal openings change, so please check with Nikola Tesla Airport expansion before you go.

Last checked: 18 Nov 2026 How we choose

Location

The map comes from Google Maps, which sets its own cookies once it loads.

Open in Google Maps

The ULTIMATE letter

Zemun in your inbox

An occasional email with new places, events, the quay’s summer openings and our latest in-depth articles. No spam, ever.