Transport · 26 of the best in Zemun

Pontoon bridge to Lido (summer)

Seasonal pontoon bridge·Zemun Quay

July & August

Each summer the army lays a 355-metre pontoon bridge from the Zemun bank to Lido beach.

About Pontoon bridge to Lido (summer)

In summer Zemun walks to the beach. In 2026 members of the Serbian Armed Forces laid a 355-metre pontoon bridge from the Zemun bank of the Danube to Lido beach on Great War Island, open from 1 July and planned to stay until the end of August if the river level allows, with the River Flotilla looking after it. Our advice: check the opening date each June, as it depends on the river.

Our take

  • 355 metres across the Danube
  • Season from 1 July to the end of August in 2026
  • Kept by the River Flotilla
Address
Zemun Quay, Zemun

Get directions

Opening hours, prices and seasonal openings change, so please check with Pontoon bridge to Lido (summer) before you go.

Last checked: 18 Nov 2026 How we choose

Location

The map comes from Google Maps, which sets its own cookies once it loads.

Open in Google Maps

The ULTIMATE letter

Zemun in your inbox

An occasional email with new places, events, the quay’s summer openings and our latest in-depth articles. No spam, ever.